|
The eProcurement System of PMGSY eTendering enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
|
| |
1. Construction of High Level Bridge of 2 Span 15 M Each Eff Over Kiran Drain at RD 2.70 Km Under PMGSY III |
Bid No 13 Dated 05.06.2025 Bridge on Krian Drain |
27-Jun-2025 05:00 PM |
30-Jun-2025 11:00 AM |
2. Construction of High Level Bridge (3x12.5m), over UBDC falling on Shri Hargobindpur Sahib Road Nainekot LAdhupur Kiri Afgana upto Kahnuwan Ghorewah Road at RD 1410 Mtr in District Gurdaspur under scheme PMGSY III Batch III |
12.05dt29052025 |
23-Jun-2025 05:00 PM |
24-Jun-2025 11:00 AM |
3. Construction of High Level Bridge (Single Span 20 m) over Kahnuwan Swamp Drain Falling on Kahnuwan to Bhurian Sainian VIA Simbli upto Chak Sharif road RD2160 Mtr including approaches in District Gurdaspur |
12.04DT29052025 |
23-Jun-2025 05:00 PM |
24-Jun-2025 11:00 AM |
4. Construction of High Level bridge (2x15m), over UBDC falling on road Pantori to Batala Shri Hargobindpur Road Ladha Munda Kohali (PB06112) at RD 2540 Mtr in District Gurdaspur under Scheme PMGSY III Batch III |
12.03dt29052025 |
23-Jun-2025 05:00 PM |
24-Jun-2025 11:00 AM |
5. Construction of High Level Bridge (2x15m), Over UBDC falling on Mehta Shri Hargobindpur road to Bolewal via Talwandi at RD 3750 Mtr in District Gurdaspur under scheme PMGSY Phase III Batch III |
29.02dt29052025 |
23-Jun-2025 05:00 PM |
24-Jun-2025 11:00 AM |
6. Construciton of High Level Bridge (2 x 15m) over Dalla Drain falling on Qadian Harchowal road (PB06116) at RD 55.00 Mtr in District Gurdaspur under Scheme PMGSY Phase III Batch III District Gurdaspur |
12.01dt29052025 |
23-Jun-2025 05:00 PM |
24-Jun-2025 11:00 AM |
7. CONST OF HL BRIDGE SINGLE SPAN STEEL TRUSS 36.00 EACH EFF OVER SIRHIND CANAL XING BHUCHO KALAN TO NATHANA VIA SEEMA POOHLI AT RD 8.70 KM INC APPR ROAD DIVERSION DISMANTLING 2.5 M HIGH RCC RETAINING WALL ETC PMGSYIII BATCH I PAC NO PB02 047 |
PB-02-47 |
18-Jun-2025 11:00 AM |
18-Jun-2025 01:00 PM |
8. Constn of HL Bridge Skew span 12m each Eff over lisara drain crossing bathinda kheowali road to NH64 via jassi sangat phullo jai singh including its approaches road diversion dismantling and 2 point 5 M high RCC Ret wall PMGSY III Pak No PB02_048 |
C2/3 |
20-Jun-2025 11:00 AM |
20-Jun-2025 01:00 PM |
9. CONSTRUCTION OF HIGH LEVEL BRIDGE SINGLE SPAN STEEL TRUSS 36.00 M EFF. OVER SIRHIND CANAL X-ING GOBINDPURA TO BATHINDA-TALWANDI ROAD VIA BHUCHO KALAN AT RD 7.60 KM INCLUDING APPROACHES UNDER PMGSY-III (BATCH-I) PACKAGE NO PB-02 046, BLOCK NATHANA, DI |
PB-02-46 |
18-Jun-2025 11:00 AM |
18-Jun-2025 01:00 PM |
10. Const. of HL Bridge 4 spans 9.4 mtr., 14.13 mtr., 14.13 mtr., and 9.4 mtr. each eff. over Sirhind Choe x-ing Jakhepalbas to Hero Khurd road including approaches, road diversion, dismantling in Distt. Sangrur under PMGSY_III (Batch_I) PB_17319 |
Bid No 15 Dt.26-05-2024 |
17-Jun-2025 03:00 PM |
18-Jun-2025 04:00 PM |
|
|
|
|
 |
|
|
|
|
|
|
Search with ID/Title/Reference no |
|
|
|